Fixed-scope product work: how to scope it
How to write a fixed scope for product or AI work before it starts: the decision, the deliverable counted, inputs, dates, what’s out and acceptance.
1. Start from the decision
Write two to four sentences, in the buyer’s words: what is happening, why it matters now, and what a good result would let them decide. “Should we change our pricing before the launch?” is a scope. “Improve our pricing” is not.
Everything below follows from that sentence. If a deliverable doesn’t help the decision, it doesn’t belong.
2. Name and count what you get
“Recommendations” can’t be checked. “Ten changes, in order of priority, each with what I saw, why it matters and what to try instead” can. Count everything that can be counted: changes, test cases, screens, calls and their length. Name the form too: a written document, a recording, a clickable prototype.
3. List the inputs, each with a date
Write down what the work needs from the buyer, and by when: a URL, a test account, read-only access, two calls with the person who owns the feature. Then say what a late input does. In my terms, the later dates move by at least as long as the delay (source 2).
4. Date it from a start you can see
Give the dates in working days from a start both sides can see: the day the first payment and the inputs have both arrived. “Delivered in five working days from the start” holds; “delivered next Friday” breaks the first time an input is late.
5. Say what is out, as a list
Draw the edge of the scope in words, so nobody has to guess where it is. A teardown’s list might read: changes to the product (they are written down, and the team makes them), reading the buyer’s own numbers, and a live call. Add what the work never covers, such as legal or tax conclusions.
6. Price a change as a new item
Anything outside the scope is a change. It gets its own fixed price, in writing, and work on it starts only once it is accepted. Corrections that make a deliverable match the scope are free (source 2). Nothing is billed by the hour, so neither side has to watch the clock.
7. Write acceptance you can check
Acceptance measures the work against the scope: is everything listed there, in the form named? Give the buyer a set number of working days to check, and yourself a set number to correct. And say plainly that disagreeing with a recommendation, or deciding not to act on it, doesn’t make a deliverable wrong (source 2).

When to fix the time instead
Fixed scope suits work whose output can be named before it starts. Building something new is different: the right solution appears as you build. Basecamp’s Shape Up turns the question round with an “appetite”, the time you want to spend, and calls the result “fixed time, variable scope”. An estimate starts from a design and ends in a number; an appetite works the other way round (source 1).
A useful order: fix the scope of the deciding work first (the review, the audit, the spec), then fix the time of the build that follows. Neither shape fits
The one-page scope
- The decision, in the buyer’s words.
- What you get, named, counted and in a stated form.
- What is needed, each input with a date.
- The dates, in working days from a visible start.
- The price, fixed, with when each part is paid.
- What is out, as a list.
- How a change is priced: a new item, in writing, before work on it starts.
- Acceptance: what “matches the scope” means, and the days to check and to correct.
A worked example: the Teardown
This is how the scope of my entry offer reads, from the Teardown page:
- What you get: one public page or flow captured at desktop and phone widths on a stated date, with notes drawn on it; ten changes in order of priority; the three to make first at the top; a
15-minute recorded walkthrough. - What I need: the address of the page or flow, and a test account if it sits behind a
sign-in . - Dates: five working days from the start.
- Price: fixed, and paid in full before the work starts.
- Not included: changes to your product, reading your own numbers, and a live call.
Every offer on the Studio page is written the same way.
Start with a small fixed piece
If you have a pricing page, a signup flow or an AI feature to look at, the Teardown is the smallest fixed piece I sell.
Sources
- Ryan Singer, Shape Up (Basecamp), chapter 3, “Set Boundaries”, basecamp.com/shapeup/1.2-chapter-03, read on 20 October 2026: appetite, and “fixed time, variable scope”.
- quietlybuild, “Studio client terms”, version 0.1, quietlybuild.in/terms/studio, 19 October 2026: sections 4 and 6, on scope, changes, late inputs and acceptance.
What changed in this guide
- 20 October 2026. Written.